Mapecoat pu 20 N floor per square M ² Mapecoat pu 20 N floor per square M ² Mapecoat pu 20 N floor per square M ² Mapecoat pu 20 N floor per square M ² Mapecoat pu 20 N floor per square M ²
Mapecoat pu 20 N floor per square M ² Mapecoat pu 20 N floor per square M ² Mapecoat pu 20 N floor per square M ² Mapecoat pu 20 N floor per square M ² Mapecoat pu 20 N floor per square M ²

Mapecoat pu 20 N floor per square M ²

Digital product
New 800 available
R765.45
Shipping
This is a digital product (eg. voucher, product license, service, etc.) and does not require shipping. The seller will be in contact to deliver this product to you electronically.
The seller has indicated that they will usually have this item ready to ship within 14 business days. Shipping time depends on your delivery address. The most accurate delivery time will be calculated at checkout, but in general, the following shipping times apply:
 
Standard Delivery
Main centres:  1-3 business days
Regional areas: 3-4 business days
Remote areas: 3-5 business days
Seller
Get it now, pay later

Product details

Condition
New
Location
South Africa
Bob Shop ID
648899957
We services Gauteng province 

Mapecoat PU Floor with Professional Installation

Durable, Chemical-Resistant, and Visually Appealing Flooring Solutions


We offer high-quality Mapecoat PU Floor coatings with expert installation services. Perfect for:

- Residential areas

Benefits:

1. Durable and long-lasting
2. Resistant to chemicals and heavy wear
3. Easy to clean and maintain
4. Aesthetic appeal with various color options
 
Our Comprehensive Service Includes
-Self-levelling screed Ultraplan eco 2o 
- Bonding liquid Planicrete for a strong bond
- Moisture barrier Triblock-P for long-lasting protection
 -Mapecoat PU Floor Coatings 

our pricing for metallic epoxy flooring is calculated per square meter. However, please note that this price does not include any necessary flooring repairs. If your floor requires repairs before we can apply the epoxy coating, 


- Project start date: Upon verification of square meters and confirmation of project details.
- Project commencement: Preparation of floors will begin on the start date.
- Delivery timeline: The project is expected to be completed within 14 working days from the start date, subject to progress and any unforeseen circumstances.

- Project work will begin after payment confirmation and verification of square meters.



Add to cart

Recently viewed

See more
38% OFF
HP | 950XL | 950 High Yield Black Ink Cartridge - Generic
New
R125.00 R200.00
Izzy – Ascolta CD
Secondhand
R100.00
ZAMBIA 1986 HALLEY'S COMET SET OF 4 VFU. SG 464-467. CAT 8,75 POUNDS. (2014)
Refurbished
R65.00
5pcs Replacements for Roborock H6 Vacuum Cleaner Parts Accessories HEPA Filters*4 Cleaning Tool*1 [N
New
R557.00

Similar products

PIPE POLYCOP 15MMX50M PER ROLL
New
R415.00
45% OFF
1pc 2x2m Courtyard Rectangular Sunshade Net Breathable Square Sunshade Suitable for Balconies Garage
New
R340.00 R620.00
Self-levelling screed Ultraplan eco 20 installation per square m²
New
R350.00