POOL PUMP SPECK FLANGE BADU 90 SERIES WITH FOOT/T

POOL PUMP SPECK FLANGE BADU 90 SERIES WITH FOOT/T

10 available / new
R319.99
Shipping
R35.00 Standard shipping using one of our trusted couriers applies to most areas in South Africa. Some areas may attract a R30.00 surcharge. This will be calculated at checkout if applicable.
Check my rate
The seller has indicated that they will usually have this item ready to ship within 3 business days. Shipping time depends on your delivery address. The most accurate delivery time will be calculated at checkout, but in general, the following shipping times apply:
 
Standard Delivery
Main centres:  1-3 business days
Regional areas: 3-4 business days
Remote areas: 3-5 business days
Seller
Get it now, pay later

Product details

Condition
New
Location
South Africa
Product code
292.1111.300
Bob Shop ID
598317810

POOL PUMP SPECK FLANGE BADU 90 SERIES WITH FOOT/T

Product Overview:

Introducing the SPECK PUMP FLANGE for the BADU 90 Series with Foot/T, a crucial component designed to seamlessly integrate the gland housing onto your pool pump system. This flange, when used in conjunction with the Speck Porpoise Pool Pump Mechanical Shaft Seal, ensures a watertight separation between the pump's wet end and the electrical motor. It's specifically compatible with the BADU®Porpoise and BADU®Eco Touch pool pumps.

Key Features:

  • Compatibility: Designed specifically for the BADU®Porpoise and BADU®Eco Touch models, ensuring a perfect fit and optimal function.
  • Durable Construction: Made from high-quality materials that can withstand the harsh conditions of pool environments.
  • Efficient Design: The flange's structure includes a Foot/T feature, providing stability and precise alignment between the pump and motor.
  • Ease of Installation: Attaches directly to the electrical motor's front end shield with four bolts, allowing for a straightforward setup.

Installation Instructions:

  1. Preparation: Ensure the pool pump and electrical motor are disconnected from the power supply before beginning.
  2. Alignment: Position the BADU 90 Series gland housing in place, ready to connect with the flange.
  3. Securing the Flange: Align the flange with the front end shield of the electrical motor. The Foot/T design should help with precise positioning.
  4. Bolting: Secure the flange to the motor using the four bolts. Ensure each bolt is tightened evenly to maintain alignment and create a secure connection.
  5. Final Steps: Once the flange is secured, proceed to install the mechanical shaft seal as per the instructions, completing the assembly process.
Add to cart

Recently viewed

See more
ENGINE MOUNTING - SB-0916 (TEKNOSA)
R609.00
LEGO® Star Wars Onaconda FarrKeychain
R120.00
Yello - Essential (CD)
R59.00
Complete encyclopedia of Roses deur Nico Vermeulen
R94.00 No bids

Similar products

8% OFF
SOLAR POOL PUMP SPECK BADU®SOLAR SMART
R9,799.99 R10,599.99
25% OFF
Speck BADU Porpoise 22 Pool Pump 1.1kw
R5,185.00 R6,900.00
SPECK PUMP DIFFUSER INSERT BADU 90 SERIES
R199.99
19% OFF
Speck BADU Porpoise 10 Pool Pump 0.45kw
R4,395.00 R5,400.00