Main centres: | 1-3 business days |
Regional areas: | 3-4 business days |
Remote areas: | 3-5 business days |
Specifications:
ModelName | MPPT-30A | MPPT-40A | MPPT-50A | MPPT-60A |
Charging mode | MPPT Maximum power poin tracking automatically | |||
Charging | 3-stage:constant current(MPPT), constant voltage(Absorption Voltage), floating charge | |||
System type | DC12V/24V/36V/48V Recognition automatically | |||
System voltage automatic recognition | 12V system (DC9V-DC15V) | |||
24V system (DC18V-DC29V) | ||||
36V system (DC30V-DC39V) | ||||
48V system (DC40V~DC60V) | ||||
Soft start time | 1S | |||
Dynamic response and recovery time | 98.1% (Voc is 1.5 or 2 times than battery, then its best efficiency) | |||
PV utilization | 99% | |||
Input specification | ||||
Voc from PV( Make sure the Voc of PVmeeting the requirement as right. Voc is 1.5 or 2 times than battery, then its best efficiency. ) | 12V system (DC20V~DC80V) | |||
24V system (DC37V~DC105V) | ||||
36V system (DC50V~DC160V) | ||||
48V system (DC72V~DC160V) | ||||
The maximum PV input voltage (Voc) | DC190V(The controller cant work at this voltage of long duration that will break controller. Please refer to Input voltage from PV.) | |||
The maximum PV input power(The total power rated of PV cant be over this watt that will break the controller.) | 12V system (360W) | 12V system (480W) | 12V system (600W) | 12V system (720W) |
24V system (720W) | 24V system (960W) | 24V system (1200W) | 24V system (1440W) | |
36V system (1080W) |