| Main centres: | 1-3 business days |
| Regional areas: | 3-4 business days |
| Remote areas: | 3-5 business days |
CONTENTS: 1. A preliminary survey; 2. Carburation and induction factors; 3. Attention to the cylinder head; 4. Adjusting compression ratios; 5. Checking wear on piston and rings; 6. The connecting rod and big-end assembly; 7. Truing and balancing flywheels; 8. Work on the crankcase; 9. First steps in reassembly; 10. Reassembling the cylinder head; 11. Toward lighter valve mechanism; 12. Determining suitable valve overlap; 13. Efficient cylinder filling; 14. Timing the valve overlap;
15. Gearbox inspection and overhaul; 16. Internal box ratios and tuning the transmission; 17. Kickstarters and foot change mechanisms; 18. Attention to clutches; 19. Aligning the primary drive and checking frames; 20. Truing frames and forks; 21. Overhauling brakes and Brake installation; 22. Gear ratios and speed tables; 23. Attention to machine details, tanks, pipes & balancing; 24. Carburettor tuning and mounting; 25. Sparking plug selection and table.



